Erection and Commissioning

Rapid erection and commissioning of SVT marine loading arms

Erection

SVT loading arms ship out fully pre-assembled with all their hydraulics and electronics already installed. This saves considerable time and money when assembling the marine loading arms.

In one case, it took only eight workdays to fully mechanically install five 16" (40.6 cm) LNG loading arms.

 

Commissioning

Specially trained SVT engineers and technicians commission loading arms all over the world.

The short commissioning times help slash costs.